Don and Shelli experienced a major flood, which was from the top down, so from the third floor, second floor, basement, the house was a total write off. They had to look at getting everything replaced from crown moldings to the hard wood floor to dry wall et cetera, and having had Michael just in the throes of completion of the carriage house and seeing the tremendous work he did, he was their only choice in terms of who they wanted to have do the work.